Health, Safety, Security & Environment (HSSE)

Protecting people first.

Our commitment to HSSE excellence.

At Acwa, Health, Safety, Security, and Environment (HSSE) is not simply a compliance requirement, it is a strategic imperative. We safeguard our people, protect our assets, and ensure business continuity through three pillars that guide our approach:

01
Building a culture of accountability and ownership

Safety is personal, and we believe it must be owned by everyone. We are shaping a culture where every individual is empowered and expected to take responsibility for HSSE.

  • Our newly launched Just and Fair Culture Framework promotes transparency, open communication, and shared responsibility.
  • Our NOVA Accountability Tool gives leaders and teams the visibility they need to make informed, safety-first decisions.
  • Our clear enforcement policies and transparent reporting mechanisms reinforce the belief that safety is everyone’s job.

Across the company, at every level, integrity and accountability drive how we work and how we protect one another.

02
Raising standards and managing critical risks

As we scale, operational safety evolves with us. We are simplifying complex systems, raising expectations, and putting risk management at the center of performance.

  • Operational Safety Specifications (OSS) provide structured, risk-based guidance across all sites, rolled out in phased implementation.
  • Essential Standards are released monthly to keep every project aligned with the latest HSSE requirements.
  • Contractual HSSE milestones are linked directly to monthly performance-based payments, making safety integral to how success is measured.
03
Integrating HSSE into projects, tenders, and partnerships

HSSE begins long before construction and continues through the entire project lifecycle.

  • Dedicated Business Development & Tendering Support (BDTS) team embeds HSSE considerations from the earliest planning stages.
  • Stronger, enforceable HSSE requirements are integrated into contracts to ensure compliance.
  • Rigorous subcontractor prequalification process ensures every partner is aligned with our safety vision before work begins.

Environmental & social impact studies

Transparency is central to our operations. As part of our HSSE commitment, Acwa publishes environmental & social impact studies (ESIS) for projects in line with international standards and lender requirements, ensuring accountability to communities and stakeholders.

Afif PV 1 ESIA Disclosure Package

  • Afif PV 1 Environmental & Social Impact Assessment

Afif PV 2 ESIA Disclosure Package

  • Afif PV 2 Environmental & Social Impact Assessment

Al Dur II IWPP ESIA Disclosure Package

  • Al Dur II IWPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Al Dur II IWPP Environmental & Social Impact Assessment Volume 2

  • Al Dur II IWPP Environmental & Social Impact Assessment Volume 3

  • Al Dur II IWPP Environmental & Social Impact Assessment Volume 4

Al Humaij ESIA Disclosure Package

  • Al Humaij Environmental & Social Impact Assessment

Al Kahfah PV IPP ESIA Disclosure Package

  • Al Kahfah PV IPP Environmental & Social Impact Assessment

  • Al Kahfah PV IPP Environmental & Social Impact Assessment Addendum

Al Khushaybi PV IPP ESIA Disclosure Package

  • Al Khushaybi PV IPP Environmental & Social Impact Assessment

  • Al Khushaybi PV IPP Environmental & Social Impact Assessment Addendum v 1.0

Al Mowyah PV IPP ESIA Disclosure Package

  • Al Mowyah PV IPP Environmental & Social Impact Assessment

  • Al Mowyah PV IPP Environmental & Social Impact Assessment Addendum v 1.0

Ar Rass Solar PV IPP ESIA Disclosure Package

  • Ar Rass Solar PV IPP Environmental & Social Impact Assessment

Ar Rass 2 Solar PV IPP ESIA Disclosure Package

  • Ar Rass 2 Solar PV IPP Environmental & Social Impact Assessment

  • Ar Rass 2 Solar PV IPP Environmental & Social Impact Assessment Addendum

Azerbaijan Wind IPP ESIA Disclosure Package

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Non-Technical Summary

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 2 Main Report

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 4 Appendices

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Consultation Disclosure

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Addendum

  • Azerbaijan Wind IPP Area 1 Stakeholder Engagement Plan

  • Azerbaijan Wind IPP Area 1 Livelihood Restoration Plan

  • Azerbaijan Wind IPP Area 1 Environmental & Social Management Plan

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Non-Technical Summary

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 2 Main Report

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 4 Appendices

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Consultation Disclosure Report

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Addendum

  • Azerbaijan Wind IPP Khizi 3 Stakeholder Engagement Plan

  • Azerbaijan Wind IPP Khizi 3 Livelihood Restoration Plan

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Management Plan

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Non-Technical Summary

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 2 Main Report

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Azerbaijan Wind IPP Area 1 Environmental & Social Impact Assessment Volume 4 Appendices

  • Azerbaijan Wind IPP Area 1 Stakeholder Engagement Plan

  • Azerbaijan Wind IPP Area 1 Livelihood Restoration Plan

  • Azerbaijan Wind IPP Area 1 Environmental & Social Management Plan

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Non-Technical Summary

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 2 Main Report

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Impact Assessment Volume 4 Appendices

  • Azerbaijan Wind IPP Khizi 3 Stakeholder Engagement Plan

  • Azerbaijan Wind IPP Khizi 3 Livelihood Restoration Plan

  • Azerbaijan Wind IPP Khizi 3 Environmental & Social Management Plan

Bash 500MW WF & Bash 52MW WF ESIA Disclosure Package

  • Bash 500MW WF & Bash 52MW WF Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash 52MW WF Environmental & Social Impact Assessment Volume 2 Addendum

  • Bash 500MW WF & Bash 52MW WF Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Bash 52MW WF Environmental & Social Impact Assessment Volume 4 Appendices

  • Bash 500MW WF & Bash 52MW WF Stakeholder Engagement Plan

  • Bash 52MW WF Resettlement Action Plan Addendum

  • Bash 500MW WF & Bash 52MW WF Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash 52MW WF Environmental & Social Impact Assessment Volume 2 Addendum

  • Bash 500MW WF & Bash 52MW WF Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Bash 500MW WF & Bash 52MW WF Stakeholder Engagement Plan

  • Bash 52MW WF Resettlement Action Plan Addendum

  • Bash 500MW WF & Bash 52MW WF Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash 52MW WF Resettlement Action Plan Addendum

Bash Wind IPP ESIA Disclosure Package

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 4 Appendices Part A

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 4 Appendices Part B

  • Bash Wind IPP Stakeholder Engagement Plan

  • Bash Wind IPP Resettlement Action Plan

  • Bash Wind IPP Summary of Material Updates to the Environmental & Social Impact Assessment Package

  • Bash Wind IPP Environmental & Social Impact Assessment Consultation and Disclosure Report

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Bash Wind IPP Stakeholder Engagement Plan

  • Bash Wind IPP Resettlement Action Plan

  • Bash Wind IPP Summary of Material Updates to the Environmental & Social Impact Assessment Package

  • Bash Wind IPP Environmental & Social Impact Assessment Consultation and Disclosure Report

  • Bash Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Bash Wind IPP Resettlement Action Plan

Bisha Solar Power Project ESIA Disclosure Package

  • Bisha Solar Power Project Environmental & Social Impact Assessment

DEWA V PV ESIA Disclosure Package

  • Mohammed Bin Rashid Al Maktoum Solar Park Phase V Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Mohammed Bin Rashid Al Maktoum Solar Park Phase V Environmental & Social Impact Assessment Volume 2 Main Report

  • Mohammed Bin Rashid Al Maktoum Solar Park Phase V Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Mohammed Bin Rashid Al Maktoum Solar Park Phase V Environmental & Social Impact Assessment Volume 4 Appendices

  • Mohammed Bin Rashid Al Maktoum Solar Park Stakeholder Engagement Plan

Dzhankeldy Wind IPP ESIA Disclosure Package

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 3 Environmental and Social Management

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 4 Appendices Part A

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 4 Appendices Part B

  • Dzhankeldy Wind IPP Stakeholder Engagement Plan

  • Dzhankeldy Wind IPP Resettlement Action Plan

  • Dzhankeldy Wind IPP Summary of Material Updates to Environmental & Social Impact Assessment

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Consultation & Disclosure Report

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 3 Environmental and Social Management

  • Dzhankeldy Wind IPP Stakeholder Engagement Plan

  • Dzhankeldy Wind IPP Resettlement Action Plan

  • Dzhankeldy Wind IPP Summary of Material Updates to Environmental & Social Impact Assessment

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Consultation & Disclosure Report

  • Dzhankeldy Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Dzhankeldy Wind IPP Resettlement Action Plan

Haden PV IPP ESIA Disclosure Package

  • Haden PV IPP Environmental & Social Impact Assessment

  • Haden PV IPP Environmental & Social Impact Assessment Addendum

Hassyan IWP ESIA Disclosure Package

  • Hassyan IWP Environmental & Social Impact Assessment

Ibri II PV IPP ESIA Disclosure Package

  • Ibri II PV IPP Construction Monitoring Report Non-Technical Summary (1st Quarter 2020)

  • Ibri II PV IPP Resettlement Action Plan

  • Ibri II PV IPP Stakeholder Engagement Plan

Jazan IGCC ESIA Disclosure Package

  • Jazan IGCC Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Jazan IGCC Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

Karatau Wind IPP ESIA Disclosure Package

  • Karatau Wind IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Karatau Wind IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Karatau Wind IPP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Karatau Wind IPP Environmental & Social Impact Assessment Volume 4 Appendices

  • Karatau Wind IPP Stakeholder Engagement Plan

Khalladi Wind IPP ESIA Disclosure Package

  • Khalladi Wind IPP Environmental & Social Impact Assessment Non-Technical Summary

  • Khalladi Wind IPP Environmental & Social Action Plan

  • Khalladi Wind IPP Project Description

  • Khalladi Wind IPP Project Description Annex

  • Khalladi Wind IPP Environmental & Social Impact Assessment Non-Technical Summary

  • Khalladi Wind IPP Stakeholder Engagement Plan

  • Khalladi Wind IPP Stakeholder Engagement Plan Annex

  • Khalladi Wind IPP Social Impact Assessment

  • Khalladi Wind IPP Biodiversity Protection Plan

  • Khalladi Wind IPP Biodiversity Protection Plan Annex

  • Khalladi Wind IPP Land Acquisition Review and Livelihood Restoration

  • Khalladi Wind IPP Environmental & Social Management & Monitoring

  • Khalladi Wind IPP Noise Impact Assessment

  • Khalladi Wind IPP Noise Impact Assessment Windless Condition

  • Khalladi Wind IPP Noise Impact Assessment Main Wind Condition

  • Khalladi Wind IPP Flicker Effect Assessment

  • Khalladi Wind IPP Flicker Effect Assessment Shadow Flicker Effect

  • Khalladi Wind IPP Environmental & Social Action Plan

  • Khalladi Wind IPP Environmental and Social Impact Assessment

  • Khalladi Wind IPP Project Description

  • Khalladi Wind IPP Project Description Annex

  • Khalladi Wind IPP Environmental & Social Impact Assessment Non-Technical Summary

  • Khalladi Wind IPP Stakeholder Engagement Plan

  • Khalladi Wind IPP Stakeholder Engagement Plan Annex

  • Khalladi Wind IPP Social Impact Assessment

  • Khalladi Wind IPP Biodiversity Protection Plan

  • Khalladi Wind IPP Biodiversity Protection Plan Annex

  • Khalladi Wind IPP Power Line Alignment Habitats Map

  • Khalladi Wind IPP Wind Farm Cumulative Map

  • Khalladi Wind IPP Wind Farm Habitat Driven Map

  • Khalladi Wind IPP Land Acquisition Review and Livelihood Restoration

  • Khalladi Wind IPP Environmental & Social Management & Monitoring

  • Khalladi Wind IPP Noise Impact Assessment

  • Khalladi Wind IPP Noise Impact Assessment Windless Condition

  • Khalladi Wind IPP Noise Impact Assessment Main Wind Condition

  • Khalladi Wind IPP Flicker Effect Assessment

  • Khalladi Wind IPP Flicker Effect Assessment Shadow Flicker Effect

  • Khalladi Wind IPP Environmental & Social Action Plan

  • Khalladi Wind IPP Environmental Impact Assessment Environmental Specifications

  • Khalladi Wind IPP Environmental and Social Impact Assessment

  • Khalladi Wind IPP Environmental Impact Assessment Approval

  • Khalladi Wind IPP Environmental & Social Impact Assessment Approval Annexes

  • Hard copies of the Khalladi Wind Farm ESIA Disclosure Package and Khalladi Environmental Impact Assessment are also available at the “bureau d’ordres” at the following municipalities: Qsar Sghir: Commune Ksar Sghir, Préfecture Fahs Anjra, Wilaya de Tanger. Meloussa: Commune Meloussa, Préfecture Fahs Anjra, Wilaya de Tanger. Khmis Anjra: Commune Fahs ANJRA, Préfecture Fahs Anjra, Wilaya de Tanger. Souk Kdim: Commune Souk Kdim, Province Tetouan Sadina: Commune Sadina, Province Tetouan

Khulais ESIA Disclosure Package

  • Khulais Environmental & Social Impact Assessment

Kirikkale CCGT IPP ESIA Disclosure Package

  • Kirikkale CCGT IPP Plant ESIA Volume 1 Non-Technical Summary

  • Kirikkale CCGT IPP Plant ESIA Volume 2 Main Report

  • Kirikkale CCGT IPP Plant ESIA Volume 2 Main Report Annexes

  • Kirikkale CCGT IPP Plant ESIA Volume 3 Environmental & Social Management & Monitoring

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 1 Non-Technical Summary

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 2 Main Report

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 2 Main Report Annexes

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 3 Environmental & Social Management & Monitoring

  • Kirikkale CCGT IPP Plant & Overhead Transmission Line Stakeholder Engagement Plan

  • Kirikkale CCGT IPP Plant & Overhead Transmission Line Stakeholder Engagement Plan Annexes

  • Kirikkale CCGT IPP Plant ESIA Volume 1 Non-Technical Summary

  • Kirikkale CCGT IPP Plant ESIA Volume 2 Main Report

  • Kirikkale CCGT IPP Plant ESIA Volume 2 Main Report Annexes

  • Kirikkale CCGT IPP Plant ESIA Volume 3 Environmental & Social Management

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 1 Non-Technical Summary

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 2 Main Report

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 2 Main Report Annexes

  • Kirikkale CCGT IPP Overhead Transmission Line ESIA Volume 3 Environmental & Social Management & Monitoring

  • Kirikkale CCGT IPP Plant & Overhead Transmission Line Stakeholder Engagement Plan

  • Kirikkale CCGT IPP Plant & Overhead Transmission Line Stakeholder Engagement Plan Annexes

Kom Ombo PV IPP ESIA Disclosure Package

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 3 Environmental and Social Management (Contractors Management Plan)

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 4 Appendices

  • Kom Ombo PV IPP Appendix A Preliminary Environmental Assessment

  • Kom Ombo PV IPP Appendix C Egyptian Environmental Affairs Agency

  • Kom Ombo PV IPP Appendix D Ambient Air Quality Survey

  • Kom Ombo PV IPP Appendix D Soil Investigation

  • Kom Ombo PV IPP Appendix D Noise Monitoring

  • Kom Ombo PV IPP Appendix D Climatic Profile

  • Kom Ombo PV IPP Appendix D Geography, Geomorphology, Geology and Land Use

  • Kom Ombo PV IPP Appendix D Ecology

  • Kom Ombo PV IPP Appendix F Noise Certificate

  • Kom Ombo PV IPP Appendix G Air Calibration Certificate

  • Kom Ombo PV IPP Stakeholder Engagement Plan

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Kom Ombo PV IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Kom Ombo PV IPP Appendix B MoU for Land

  • Kom Ombo PV IPP Appendix C Egyptian Environmental Affairs Agency

  • Kom Ombo PV IPP Appendix E Public Hearing Session Chairman Invitation

  • Kom Ombo PV IPP Appendix E Public Hearing Session Department Invitation

  • Kom Ombo PV IPP Stakeholder Engagement Plan

Layla PV IPP ESIA Disclosure Package

  • Layla PV IPP Environmental & Social Impact Assessment

Mafraq PV IPP ESIA Disclosure Package

  • Mafraq PV IPP Sunrise 50 MW Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Mafraq PV IPP Health, Safety, Social & Environmental Policy Statement

  • Mafraq PV IPP Grievance Form

  • Mafraq PV IPP Sunrise 50 MW Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Mafraq PV IPP Health, Safety, Social & Environmental Policy Statement

  • Mafraq PV IPP Grievance Form

Noor PV 1 SESIA Disclosure Package

  • Noor Ouarzazate IV Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Noor Ouarzazate IV Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • Noor Ouarzazate IV Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Noor Ouarzazate IV Specific Environmental & Social Impact Assessment Volume 4 Technical Appendices

  • Noor Ouarzazate IV Stakeholder Engagement Plan

  • Noor Boujdour Site Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Noor Boujdour Site Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • Noor Boujdour Site Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Noor Boujdour Site Specific Environmental & Social Impact Assessment Volume 4 Technical Appendices

  • Noor Boujdour Site Stakeholder Engagement Plan

  • Noor Boujdour Corridor Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • Noor Boujdour Corridor Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Noor Boujdour Corridor Specific Environmental & Social Impact Assessment Volume 4 Technical Appendices

  • Noor Laayoune Site Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Noor Laayoune Site Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • Noor Laayoune Site Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Noor Laayoune Site Specific Environmental & Social Impact Assessment Volume 4 Technical Appendices

  • Noor Laayoune Site Stakeholder Engagement Plan

  • Noor Laayoune Corridor Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • Noor Laayoune Corridor Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Noor Laayoune Corridor Specific Environmental & Social Impact Assessment Volume 4 Technical Appendices

  • Noor Ouarzazate IV Environmental & Social Impact Studies

NOORo II IPP SESIA Disclosure Package

  • NOORo II IPP Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • NOORo II IPP Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary Appendix

  • NOORo II IPP Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • NOORo II IPP Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • NOORo II IPP Specific Environmental & Social Impact Assessment Volume 4 Appendices

NOORo III IPP SESIA Disclosure Package

  • NOORo III IPP Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • NOORo III IPP Specific Environmental & Social Impact Assessment Volume 1 Non-Technical Summary Appendix

  • NOORo III IPP Specific Environmental & Social Impact Assessment Volume 2 Main Report

  • NOORo III IPP Specific Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • NOORo III IPP Specific Environmental & Social Impact Assessment Volume 4 Appendices

Qurrayah IPP Expansion ESIA Disclosure Package

  • Qurrayah IPP Hajr Two CCGT Environmental & Social Impact Assessment Non-Technical Summary

  • Qurrayah IPP Hajr Two CCGT Environmental Social Impact Assessment Non-Technical Summary

Rabigh 3 IWP ESIA Disclosure Package

  • Rabigh 3 IWP Environmental & Social Impact Assessment Non-Technical Summary

  • Rabigh 3 IWP Greenhouse Gas and Carbon Footprint Assessment

Rabigh 4 IWP ESIA Disclosure Package

  • Rabigh 4 IWP Environmental & Social Impact Assessment Non-Technical Summary

  • Rabigh 4 IWP Environmental & Social Impact Assessment Non-Technical Summary GHG Emissions Report

Risha PV IPP ESIA Disclosure Package

  • Risha 50MW Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Risha PV IPP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Risha PV IPP Environmental & Social Impact Assessment Volume 2 Main Report

  • Risha PV IPP Environmental & Social Impact Assessment Volume 3 Social Management & Monitoring

  • Risha PV IPP Environmental & Social Impact Assessment Volume 4 Appendices

  • Risha PV IPP Stakeholder Engagement Plan

  • Risha PV IPP Annual Monitoring Report 2018

  • Risha 50MW Solar PV IPP Grievance Form

  • Risha 50MW Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Risha 50MW Solar PV IPP Grievance Form

Saad 2 PV IPP ESIA Disclosure Package

  • Saad 2 PV IPP Environmental & Social Impact Assessment

  • Saad 2 PV IPP Environmental & Social Impact Assessment Addendum

Saguling Floating Solar PV ESIA Disclosure Package

  • Saguling Floating Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Saguling Floating Solar PV Human Rights Assessment

  • Saguling Floating Solar PV Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

Sakaka PV IPP ESIA Disclosure Package

  • Sakaka PV IPP Environmental & Social Impact Assessment

Salalah IWP ESIA Disclosure Package

  • Salalah IWP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Salalah IWP Environmental & Social Impact Assessment Volume 2 Main Report

  • Salalah IWP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management Plan

  • Salalah IWP Environmental & Social Impact Assessment Volume 4 Appendices

Shaqra Wind IPP ESIA Disclosure Package

  • Shaqra Wind IPP Environmental & Social Impact Assessment

Shuaa 1 ESIA Disclosure Package

  • Shuaa 1 Environmental & Social Impact Assessment

Shuaibah PV IPP ESIA Disclosure Package

  • Shuaibah PV IPP Environmental & Social Impact Assessment

Sirdarya CCGT ESIA Disclosure Package

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 2 Main Report

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 4 Appendices

  • Sirdarya CCGT Stakeholder Engagement Plan

  • Sirdarya CCGT Environmental & Social Action Plan

  • Sirdarya CCGT Livelihood Restoration Plan

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 2 Main Report

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 4 Appendices

  • Sirdarya CCGT Stakeholder Engagement Plan

  • Sirdarya CCGT Environmental & Social Action Plan

  • Sirdarya CCGT Livelihood Restoration Plan

  • Sirdarya CCGT Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Starah Wind IPP Environmental & Social Impact Assessment

Sudair PV IPP ESIA Disclosure Package

  • Sudair PV IPP Environmental & Social Impact Assessment

Taweelah RO Desalination IWP ESIA Disclosure Package

  • Taweelah RO Desalination IWP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Taweelah RO Desalination IWP Environmental & Social Impact Assessment Volume 2 Main Report

  • Taweelah RO Desalination IWP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Taweelah RO Desalination IWP Environmental & Social Impact Assessment Volume 4 Appendices

  • Taweelah RO Desalination IWP Stakeholder Engagement Plan

  • Taweelah RO Desalination IWP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

Umm Al Quwain IWP ESIA Disclosure Package

  • Umm Al Quwain IWP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Umm Al Quwain IWP Environmental & Social Impact Assessment Volume 2 Main Report

  • Umm Al Quwain IWP Environmental & Social Impact Assessment Volume 3 Environmental & Social Management

  • Umm Al Quwain IWP Environmental & Social Impact Assessment Volume 4 Appendices

  • Umm Al Quwain IWP Stakeholder Engagement Plan

  • Umm Al Quwain IWP Environmental Approval

  • Umm Al Quwain IWP Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Umm Al Quwain IWP Environmental Approval

Zarqa CCGT ESIA Disclosure Package

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 2 Main Report

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 4 Appendices

  • Zarqa CCGT Stakeholder Engagement Plan

  • Zarqa CCGT Environmental & Social Action Plan

  • Zarqa CCGT Health, Safety, Social & Environmental Policy Statement

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 1 Non-Technical Summary

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 2 Main Report

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 3 Environmental & Social Management & Monitoring

  • Zarqa CCGT Environmental & Social Impact Assessment Volume 4 Appendices

  • Zarqa CCGT Stakeholder Engagement Plan

  • Zarqa CCGT Environmental & Social Action Plan

  • Zarqa Health, Safety, Social & Environmental Policy Statement